Today we will concentrate on issues that arose during students' Milestone 1
work.
Issues:
- Repainting the entire drawing when resizing the window, etc.
- Using a BufferedImage to persist a drawing
- Need official documentation on exactly what interfaces are in what
common packages and what methods are in those interfaces.
- Move everything that was in rmiChat to paintPlusPlus, or leave
existing ones as is?
- Need to schedule time for next week:
- Time for everyone to get together to test code and discuss issues.
- Demo day!
- Need to flesh out methods on various commands.
Friday's class will be held in OEDK 104!